Plant Manager - Solid Fuel Power Plant in Grande Cache, Alberta

Power Generator is actively searching for a Solid Fuel Facility Manager for a coal fired plant located near Grand Cache, Alberta (Canada).Requirements:Requires a BSME or BSEE degree or related discipline (will consider substantial background in lieu of a degree) and a min of ten (10) years of solid fueled power plant background. Must have proven management/leadership skills. Must have at least five years background supervising technical, supervisory and administrative personnel. Must have a thorough, demonstrated knowledge of solid-fuel plant operations and maintenance as well as management methods necessary to control and improve facility performance.Compensation:Company provides excellent compensation including full fringe benefits and relocation to the best applicant. Total compensation is anticipated to be in the range of $175,000-$200,000+ (Canadian) including base salary in the range of $160,000 - $180,000 (CAD) and up to 20% bonus based on plant profitability. Qualified candidates are encouraged to apply for this career opportunity.Please be prepared to answer the following questions when applying for this position:1. Please describe your previous solid-fuel power plant background including number of years. Detail any coal plant background.2. Please describe you previous background as a Facility Plant Manager including number of years.3. Leadership: Please describe your leadership background and expertise to improve the performance of a power plant using your "interpersonal skills".4. Please explain why your are interested in a position as a Plant Manager for a solid-fuel power plant located near Grand Cache, Alberta (Canada). (Why do you want to live here?)5. What salary do you expect for this position?Keywords: Plant Manager, Operations Superintendent, Maintenance Superintendent, O&M, O&M Manager, O&M Superintendent, Plant Performance, Power Plant Manager, Facility Manager, Operations, Maintenance, Coal, Solid Fuel, Biomass, Wood Waste, steam turbine, General Manager, Plant Superintendent, Boiler, Coal-fired, solid-fuel, CFB, Circulating Fluidized Bed Boiler, Operations & Maintenance, Performance, Pulverized Coal, Pet Coke, Petroleum Coke, WTE, Waste to Energy, Waste-To-Energy, CogenerationListing originally posted at http://www.bullhornreach.com/job/569343_plant-manager-solid-fuel-power-plant-grande-cache-ab-canada?utm_source=oodle.com&utm_medium=referral&utm_content=job&utm_campaign=feeds1

Read more

Category:  Management  |  Address:  Grande Cache Alberta


Copyright © 2017 CanadianListed.com, All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.